Skip to content

Cloud migration planned around your business hours

migration / sample cutover

Move servers, databases and applications to AWS, Azure or Google Cloud in tested stages, with data validation and a rollback plan for every cutover.

Migrate without betting the business on one weekend

Cloud migration means moving applications, data and infrastructure from on-premise servers, colocation racks, shared hosting or another cloud into a new environment. Done well, it reduces hardware worries, improves resilience and opens up managed services. Done badly, it brings broken integrations, lost records and a bill higher than the old data centre. The difference is almost always in the planning before any data moves.

We work with companies whose server leases are ending, whose hosting can no longer handle traffic, or who need to consolidate systems after an acquisition. Each workload gets a decision: rehost as is, replatform onto managed services, refactor for containers, or retire it. Then we migrate in waves, starting with low-risk systems, validating data at every step and switching traffic only when tests pass.

A cutover night, rehearsed before it happens

Scrub through a sample cutover window, then rehearse the way back. Every move is planned with a rollback that has been tested.

sample cutover night

traffic oncloud

22:0022:2023:1023:4000:1001:00

23:40

Switch traffic

DNS and the load balancer point at the cloud stack. The old environment stays intact and read-only.

if a check fails

The source stays untouched until sign-off, so going back is a routine step, not a rescue.

Our Cloud Migration services

Move servers, databases and applications to AWS, Azure or Google Cloud with planned cutovers and minimal downtime.

  1. 01

    Migration readiness assessment

    An inventory of servers, applications, dependencies and licences, with each workload scored for complexity, risk and the most sensible migration path.

  2. 02

    Rehost and replatform

    Lift existing virtual machines with minimal change, or shift them onto managed databases and load balancers to cut maintenance effort quickly.

  3. 03

    Application refactoring

    Break monoliths into containers or serverless functions where it pays off, so the application scales and deploys independently after the move.

  4. 04

    Database migration

    MySQL, PostgreSQL, SQL Server, Oracle and MongoDB moved with replication, checksums and row counts, so you know every record arrived intact.

  5. 05

    Cloud-to-cloud migration

    Switch between AWS, Azure and Google Cloud, or consolidate several accounts, when pricing, credits or a new compliance requirement makes it worthwhile.

  6. 06

    Hybrid connectivity

    Site-to-site VPN or dedicated links that let on-premise systems and cloud workloads talk securely to each other during a phased transition.

  7. 07

    Post-migration tuning

    Rightsize instances, tighten security groups and set up monitoring after cutover, so the new environment runs faster and cheaper than the old one.

Cloud Migration with Nexzem: what you get

status

  • Minimal downtime

    Replication and staged cutovers mean most moves happen within short, scheduled switch windows instead of long outages.

  • Verified data

    Automated row counts, checksums and application smoke tests confirm the data is complete before old systems are retired.

  • A way back

    Every cutover has a tested rollback path, so a surprise issue means switching back calmly, not scrambling through the night.

  • Lower running effort

    Managed databases, autoscaling and patching services remove hardware chores that used to consume a large part of your team's week.

How Cloud Migration engagements run

Clear stages with a review at the end of each, so you always know what happens next and what it costs.

  1. step/01 discover

    Discover

    We map every server, application, integration and scheduled job, including the forgotten cron task that sends invoices at midnight.

  2. step/02 plan-waves

    Plan waves

    Workloads are grouped into migration waves by risk and dependency, each gets a strategy, and cutover windows are agreed with your team.

  3. step/03 build-landing-zone

    Build landing zone

    Accounts, networking, identity, logging and guardrails are set up in the target cloud using Terraform before any workload moves.

  4. step/04 migrate-and-validate

    Migrate and validate

    We replicate data, deploy applications, run functional and data checks, then switch traffic during the agreed window.

  5. step/05 optimise-and-hand-overongoing

    Optimise and hand over

    Sizing and costs are tuned after a few weeks of real usage, old systems are decommissioned and runbooks are handed over.

Cloud Migration, in depth

docs / cloud-migration / 01-building-a-migration-business-case.md

Building a migration business case

A strong business case looks beyond hosting costs. Compare the full cost of running today's environment, including hardware refreshes, data center space, power, licenses, support contracts and staff time, with the expected cost of cloud services and the migration itself. Many organizations underestimate how much current infrastructure really costs to run.

Benefits often matter more than savings. Faster provisioning, better resilience, easier disaster recovery, access to managed databases and analytics services, and freedom from hardware lifecycles can justify migration even when monthly bills look similar. Quantify these where possible, for example by reduced downtime or faster product releases.

Risks and one-time costs belong in the case too. Running two environments during migration, refactoring applications, retraining staff and potential performance issues all add effort. Presenting them honestly builds credibility with finance and leadership teams who must approve the investment.

Finally, define success measures up front: costs, availability, recovery times, release frequency or time to provision environments. Tracking them after migration shows whether the move delivered its promised value and where further optimization is needed. Share these measures with stakeholders after each migration wave.

docs / cloud-migration / 02-common-cloud-migration-pitfalls.md

Common cloud migration pitfalls

Migrations go wrong in predictable ways, usually because of gaps in discovery or planning rather than technical failures on migration day. The pitfalls below appear repeatedly across organizations of every size, and each can be avoided with preparation during the assessment phase.

Hidden dependencies cause many failed cutovers. An application may rely on a file share, a scheduled job on another server or a hard-coded IP address that nobody documented. Dependency mapping tools and interviews with application owners uncover these connections before they break in production.

Lifting everything unchanged can also disappoint. Oversized virtual machines copied from on-premises servers often cost more in the cloud than expected. Right-sizing during migration, and modernizing selected components later, keeps costs under control from the start. Monitoring actual usage for a few weeks guides those sizing decisions.

Skipping rehearsals is risky. Test migrations of data and applications, with timed cutover rehearsals and agreed rollback criteria, turn the final migration into a well-practiced routine rather than a stressful experiment. Communicate cutover times and expected impact to users well in advance.

  • Incomplete inventory of applications and dependencies.
  • No landing zone with security and governance in place.
  • Underestimated data transfer times for large databases.
  • Licenses that do not allow cloud deployment.
  • No clear owner for each application during migration.

docs / cloud-migration / 03-operating-well-after-migration.md

Operating well after migration

Migration is the beginning of cloud operations, not the end of the project. Teams must adapt to new monitoring tools, shared responsibility for security, usage-based billing and faster change. Without new operating habits, organizations often recreate their old data center inside the cloud, with similar costs and limitations.

Cost governance should start immediately. Tagging resources by application and owner, setting budgets and alerts, and reviewing usage monthly prevents bills from creeping up. Commitments such as savings plans make sense once usage stabilizes, usually a few months after migration.

Security and reliability need equal attention. Identity and access policies, logging, backups, patching and disaster recovery tests must be configured and owned. Infrastructure as code helps keep environments consistent and makes changes reviewable rather than manual. Regular recovery tests prove that backups and failover actually work.

Over time, look for modernization opportunities. Moving databases to managed services, containerizing applications or adopting serverless components can reduce operational effort further once the initial migration has settled and the team is comfortable with the platform. Prioritize changes that remove the most operational effort or cost first.

Where Cloud Migration fits

  • env/01

    Moving an on-premises ERP to the cloud

    A manufacturer migrates its ERP servers and database to the cloud with a tested cutover over a weekend, improving backup and disaster recovery while giving branch offices more reliable access than the old office server provided.

  • env/02

    Exiting a data center before contract renewal

    A company facing an expensive data center renewal migrates dozens of applications in planned waves, retiring unused systems along the way and completing the move before the contract ends without major business disruption.

  • env/03

    Oracle to PostgreSQL database migration

    A software vendor moves its application database from Oracle to managed PostgreSQL, converting schemas and procedures, validating data and performance, and reducing licensing costs while keeping the application behavior unchanged for customers.

  • env/04

    Hybrid setup for a regulated institution

    A financial institution keeps core systems on-premises while moving customer-facing applications and analytics to the cloud, connected securely through private links and governed by consistent identity, logging and security policies.

  • env/05

    Media archive to object storage

    A media company moves years of video and image archives from aging storage arrays into cloud object storage with lifecycle policies, making assets searchable and accessible while lowering long-term storage costs.

Technologies we use for cloud migration

Proven, well-supported tools chosen for your scale, budget and team, never for novelty.

  • AWS
  • Azure
  • Google Cloud
  • Terraform
  • Docker
  • Kubernetes
  • PostgreSQL
  • MySQL
  • MongoDB

Cloud Migration FAQs

Something else on your mind? Ask a consultant and get a reply within one business day.

How long does a cloud migration take?

A single application with one database can move in a few weeks. Larger estates with dozens of servers and integrations run in waves over several months. The assessment phase gives you a realistic timeline based on your actual dependencies rather than a guess.

What drives the cost of a migration?

The number of workloads, data volume, the chosen strategy (rehosting costs less than refactoring), compliance needs, downtime tolerance and how much post-migration support you want. We share a fixed quote after a free consultation and assessment.

Will our application be down during the move?

Most migrations use data replication, so the final switch takes a short, scheduled window, often outside business hours. Where zero downtime is essential, we design blue-green or parallel-run cutovers and agree the approach with you beforehand.

Should we rehost or rebuild our application?

Rehosting is fast and low risk but keeps old inefficiencies. Refactoring costs more upfront but can reduce running costs and improve scaling. We usually recommend rehosting most systems first and refactoring only the components where the payback is clear.

How do you keep data secure during migration?

Data is encrypted in transit and at rest, transfers run over private links or VPN, access uses short-lived credentials, and we sign an NDA on request. Old copies are deleted following your retention policy once validation is complete.

Can you migrate from one cloud provider to another?

Yes. We handle AWS to Azure, Azure to Google Cloud and other combinations, translating networking, identity and managed services to their equivalents and rewriting infrastructure templates for the new provider.

Do our software licenses work in the cloud?

Not always. Some licenses are tied to physical hardware or specific deployment models, while others offer cloud rights or bring-your-own-license options. We review licenses for operating systems, databases and business applications during assessment, so licensing surprises do not delay migration or inflate costs.

Can we keep some systems on-premises?

Yes. Hybrid setups are common, keeping systems with strict latency, regulatory or hardware requirements on-premises while moving others to the cloud. Secure network connections, shared identity and consistent monitoring let both environments work together, and the balance can shift gradually over time.

How do you test that everything works after migration?

We agree test plans with application owners before migration, covering functional checks, integrations, performance and data validation such as record counts and checksums. Tests run during rehearsals and again after cutover, and application owners sign off before old systems are decommissioned.

Since our first project

Happy clients
250+
Projects delivered
150+
Industries served
15+
Pricing and engagement models
  • Mutual NDA first

    Signed before any detailed discussion of your idea.

  • You own the code

    100% of the source code and IP is yours on delivery.

  • Reply in one business day

    From a solutions consultant, Mon to Sat, 09:30 to 18:30 IST.

  • Estimate in 48 hours

    A fixed quote or team estimate, broken down by milestone.

We work with clients across the USA, UK, Australia, UAE, New Zealand and India.

Where we work

Tell us what you're building.

A solutions consultant replies within one business day with next steps, a rough estimate and a suggested team.